Equinor will start a new oil field in the Barents Sea in 2023. This field is called Johan Castberg and covers the oil discoveries of Skrugard, Havis and Drivis. Johan Castberg will consist of an extensive seabed field and an anchored production ship – a so-called FPSO. The project is of great importance for further development of oil extraction in the Barents Sea.

The production ship is manufactured in Singapore, and thus faces a month-long voyage back to Stord, Norway. Energyst was challenged to design a temporary power solution for Johan Castberg FPSO during this voyage.

Meet the customer’s needs with a custom-designed solution

The clients Equinor and Sembcorp required a solution that is not found in any standard power package.

The contract includes high requirements on technical documentation and specifications for all equipment. All components must be robust enough to withstand both the tropical heat of Singapore and the extreme weather of the North Sea, as well as the challenging voyage to Stord. In addition, equipment has to include fire and gas detection and an automatic self-extinguishing fire system.

To meet customer needs, Energyst has designed and custom-built multiple units, including a switchgear and a high-voltage transformer. The solution is build in Norway and transported to Singapore by a container ship.

“IN TODAY’S RENTAL MARKET, IT IS IMPORTANT TO BE DYNAMIC, INNOVATIVE AND SOLUTION-ORIENTED. JOHAN CASTBERG FPSO IS A PERFECT EXAMPLE OF A PROJECT WHERE WE COMBINE OUR STANDARD EQUIPMENT WITH UNITS THAT WE’VE CUSTOMIZED FOR THE PROJECT. ”

 Karl Thomas Ødegård, Application Engineer at Energyst

Lots of power in a small footprint

Energyst’s solution delivers three megawatts of power via two 1700 KVA generators that supply a 4000 amp custom-built switchgear that goes to an 11 kilovolt high-voltage transformer. This power is distributed to a number of consumers on the ship.

The generators are unique when it comes to capacity versus footprint; the power package is provided in two 20-foot containers. The total solution is limited to six containers, including an external 20,000L diesel tank.

This application ensures a power package for Johan Castberg FPSO which is optimized for an operating environment with a very high power requirement and correspondingly limited space.

Dynamic process and innovative solutions

The Johan Castberg project is the latest example of Energyst’s commitment to being a total supplier that meets every need of our customers – whether it is criteria that are in place when entering into a contract, or adapting to needs that arise during the process.

By offering custom-designed units that complement our already extended fleet, we can offer our customers innovative, complex power solutions that meet all needs, requirements and criteria.

“WE’RE ALWAYS LOOKING FOR THE OPTIMAL SOLUTION FOR OUR CUSTOMERS. IN COMPLEX PROJECTS LIKE THIS, IT’S A DYNAMIC PROCESS TO DESIGN THE MOST EFFECTIVE APPLICATION. ONLY BY CLOSE COOPERATION OF OUR TECHNICAL AND SALES TEAM WE CAN ACHIEVE A RESULT LIKE THIS.”

Stian Urdal, Key Account Manager Oil & Gas at Energyst

Oil Platform Power for major global oil company

In 2014, one of the world’s largest oil and gas companies asked Energyst Norway to provide a comprehensive, temporary power solution for their brand new, state of the art oil platform.

LEES MEER

Corrib Gas Onshore Pipeline tunnel Ireland

"We are proud to say, that because of our 24/7 commitment on site, combined with our reliable CAT hardware, our client was always 100% carefree."

LEES MEER
  • CONTACT OPNEMEN

  • This field is for validation purposes and should be left unchanged.