Referencias de proyectos anteriores

DESCUBRA LOS RESULTADOS DE NUESTRA ENERGÍA REAL

Podemos ocupar páginas y páginas hablando de nuestra apuesta por la energía real. Pero probablemente se fiará más de la opinión de representantes de empresas como la suya: personas que confían en Energyst cuando solo la mejor solución es lo suficientemente buena.

Por eso, aquí presentamos diversas referencias de proyectos anteriores, cada uno de los cuales suponía un desafío único. ¿Reconoce el suyo?

SONARA OIL REFINERY │ CAMEROON

A steady power flow is essential in the oil refining business. Especially during a high-stakes construction of a new energy plant.

“Since the final commissioning of Energyst’s power solution, SONARA has had a production of 100% without any power interruptions. That’s what we call Real Energy!”
Ibrahim Talba Malla, Chief Executive Officer, SONARA (Société Nationale de Raffinage) Cameroon

As a growing industry with an ever-increasing potential, energy is an important part of the Cameroon economy. SONARA (Société Nationale de Raffinage) owns and operates the only crude oil refinery in the country. As a temporary measure during the construction of a new power plant for the refinery, SONARA went to the market to seek a reliable partner to provide us with a 4 MW primary power solution whilst our new power plant was being built.

Oil platform power for major global oil company │ Norway

The devil is in the detail with oil platform hook-ups like this one

“The stakes were high, so we upped our agility”
Stian Urdal, Account Manager, Energyst Norway

A limited amount of space can sometimes expand your horizon. In 2014, one of the world’s largest oil and gas companies - operating in 37 countries, employing almost 36,000 people worldwide and with their head office in Norway - asked Energyst Norway to provide a comprehensive, temporary power solution for their brand new, state of the art oil platform.

Planta de generación North Mole & South District │ Gibraltar

La garantía de una fuente de alimentación fiable en Gibraltar supone un reto diario
«En Energyst, siempre luchamos por vencer cualquier obstáculo y superar las expectativas de nuestros clientes».
Manuel Mendiola, director de ventas, Energyst Mediterranean

Gibraltar quiere ser autosuficiente en cuanto a su producción y distribución, pero se enfrenta a limitaciones para conseguir este objetivo. La red de distribución eléctrica es pequeña y no está conectada a la red eléctrica española.
Esto supone un reto diario a la hora de mantener una fuente de energía fiable. Anteriormente, debido a la existencia de una red inestable, Gibraltar sufrió varios fallos eléctricos significativos. Estos fallos eléctricos tienen graves consecuencias que afectan a la vida diaria de los habitantes de Gibraltar y a sus negocios.

Enaco data center │ Sweden

Security and availability are critical for data centers all around the globe

“One can imagine the magnitude of this project and, of course, the sheer size of the data center itself. A project right up our alley, to say the least.”
Peter Jörnhult, Sales Engineer, Energyst Sweden

Black outs at data centers are extremely costly and increase the risk of data loss, which can have far-reaching consequences. So with uptime being of the essence, data centers must regularly carry out tests to ensure an uninterrupted power supply. And an uninterrupted service for their users. That is why Enaco, one of Sweden’s leading expert companies in designing, building, upgrading and servicing sustainable, energy efficient data centers contacted Energyst.

Una de las minas de cobre más grandes del mundo │ Chile

La solución personalizada de Energyst para una de las minas de cobre más grandes del mundo se eligió por varias razones

«Nuestro cliente necesitaba una gran solución energética que dejara la menor huella posible»
Cristián Gabriel Baeza Rodríguez, Ingeniero en Aplicaciones, Energyst Chile

Una de las minas de cobre más grandes del mundo, ubicada en Chile, es cliente de Energyst. Desde luego, eso hace a Energyst sentirse orgullosa. Esta mina procesa aproximadamente 230 kilotoneladas de mineral de cobre por día. Es lógico que esta mina de cobre dependa fuertemente en los suministros eléctricos. Sin embargo, cuando a esta energía la proporciona la vulnerable red regional existente, surge un grado de incertidumbre que es, comprensiblemente, inaceptable para nuestro cliente.

ENARSA Guaminí Buenos Aires │ Argentina

Objetivo: garantizar las celebraciones navideñas en una ciudad argentina

«En el sector de la restauración, es esencial contar con un suministro eléctrico constante, sobre todo cuando las temperaturas alcanzan máximos históricos y es época de fiestas. La central eléctrica de Energyst mitigó una mala situación para nosotros para gran alivio del restaurante de Vicente y, sin duda, de toda la localidad.»
Daniel Martínez, chef del restaurante, Vicente Resto Bar (Guaminí)

Gira del musical CATS │ Bélgica, Países Bajos & Luxemburgo

suministro eléctrico de CAT para la gira de CATS en Benelux
«La asistencia que nos prestó Energyst desde que empezamos a preparar el primer estreno fue excelente y profesional. Gestionaron todos los cambios con rapidez y el material es muy fiable. Sus técnicos, muy competentes e integradores, ayudaron a que todos los pasos de la instalación de la carpa transcurrieran sin problemas. Gracias a todos por su ayuda».
Sr. Thomas Luedicke, BB Promotion GmbH, Alemania

Disney On Ice show tours │ Europe & Asia

Bringing the Disney magic across the globe

"Your commitment never ceases to amaze me"
James MaCloud, Ice Operations Technical Manager, Feld Entertainment

The Disney On Ice show literally travels around the world, bringing the Disney magic to millions of families. It goes without saying that their awesome shows require equally awesome power generation and temperature control. Energy solutions that Feld Entertainment used to rent elsewhere, but now they’ve teamed up with Energyst and recently Feld and Energyst signed a 5-year contract.

P&O Cruises Oriana │ UK

Always arriving and leaving on time is part of the positive passenger experience P&O aims for

“A cruise ship never waits for anything or anyone”
Richard Betteridge, Key Account Manager Energyst

So, when one of its power generators had to be replaced, but maintenance was not scheduled for another twelve months, a temporary solution had to be found.

Leading global pharmaceutical company │ Ireland

Uninterrupted power supply for safe storage of a high-value cancer drug

“There was no margin for error”
Mark Dinneen, Project Manager, Imtech

The challenge was to set up power generators for the pharmaceutical company’s manufacturing site in Ireland. But – as the project kept evolving – this turned into a much bigger challenge, involving a custom power solution for safely storing a new cancer drug. It took all of our professional and personal engagement to deliver the best engineering solution to the customer.

GEA Refrigeration F&B distribution center │ Netherlands

The Food & Beverage industry requires reliable, constant cooling

“Hundreds of thousands of consumers cannot go without their groceries!”
Koos van der Helm, Sales Engineer, GEA Refrigeration Technologies

Reliable cooling is essential for the F&B industry. Not just because companies have to comply with regulations. It’s really all about preserving foodstuffs and beverages from spoiling and damage, ensuring business as usual for hundreds of outlets.

VU Medical Center Amsterdam │ Netherlands

Delivering reliable back-up power to keep hospital patients safe

“Energyst came up with the ideal solution, when we needed to provide back-up power that conformed to special emission specifications”
Michael Kleevens, Project Manager, Wolter & Dros Amsterdam

VU Medical Center, an Amsterdam based university hospital, is a long-standing customer of Energyst. So, when in December 2012 building works were on the agenda once more, we were called in to supply back-up power during the rebuilding of their fixed energy installations. Clearly, any type of building work concerning a hospital’s energy installations is always critical. And in this specific case lives were literally at stake…

Europe’s largest alumina refinery │ Ireland

Pulling out all the stops to keep the refinery working to its impeccably high standards

"Energyst prevented a damaged power cable from damaging our reputation"
JW, our customer's Electrical Technologist

Our customer is Europe’s largest alumina refinery. Also, it’s one of the most technologically advanced, energy-efficient facilities in the world. The refinery produces over 1.8 million tonnes of alumina per year, a fine white powder that is exported to aluminium smelters for processing into metal. But this enormous production nearly ground to a halt, because of a damaged power cable…

Crossrail Western Tunnels London │ UK

Portable, low emissions underground power solution for the Western Tunnels project

“Energyst makes custom solutions feel as easy and carefree as standard ones”
Peter Pearson, BAM UK

The Western Tunnels project is a 22 kilometer long tunneling project underneath the City of London. Not an easy task to take on, as you can imagine. Which is why BAM, Ferrovial & Kier (BFK) have teamed up to bring together their strengths in tunneling, civil engineering, and construction. To facilitate work in the transport tunnel, BFK asked Energyst for portable power.

Corrib Gas Onshore Pipeline Tunnel │ Ireland

Heavy duty power equipment and a highly committed Energyst team on site at the Corrib Gas Onshore Pipeline tunnelling project

“One year of constant heavy drilling, and not a single second of downtime”
PJ Smyth, Service & Maintenance Supervisor, Energyst Ireland

In January 2011, Shell Ireland was granted permission for the construction of the Corrib Gas Onshore Pipeline. One that is 8.3 km long, 4.9 km of which will be constructed within a tunnel running under the Sruwaddacon Bay tidal estuary in County Mayo. When constructed, the tunnel will be the longest tunnel in Ireland and the longest gas pipeline tunnel anywhere in Europe. You can probably imagine, this will take heavy and long drilling.

Cwrt Cottage Wales │ UK

Global coverage, local commitment

"Our CAT generator was returned to Cwrt Cottage and re-installed, now it is beavering away again every weekend and more keeping the lights on in the cottage - and the kettle, toasters, pumps, heating, immersion heater and the rest. All thanks to the generosity of Energyst and its enthusiastic staff - thank you from me and many hundreds of cottage users!"
Brian Gwynn, Cwrt Adventure Trust