CUSTOMER STORIES OVERVIEW

Energyst delivers a stand-alone cooling system within 20 hours 

On a production plant of our customer, a technical failure in an existing cooling unit resulted in an urgent need for 2300 kW of cooling to be connected to the existing network. The loss of the existing cooling caused a problem in the production process. Within 20 hours, Energyst was able to deliver and connect the stand-alone project.


 
Energyst supplies power to its own cooling installation during a shutdown operation 

During a planned shutdown at BP Chembel in Geel (Belgium), Energyst cooling systems are used to provide a heat exchanger with the required flow of chilled water for the condensation of the primary gas flow.


 
Extra rental cooling and heating capacity 

Energyst supports a chemical company with temperature control issues.


 
Reliable back-up cooling solution 

Energyst provided a complete temporary cooling solution to Teijin Twaron, a a manufacturer of aramid polymers. Their existing system required renovation / replacement when system failures would result in major production losses. Energyst was able to guarantee the continuity of the production process at all times.


 
Rental electrical power supply of 38 MVA 

For its business activities, our client required an extra power supply to start up engines ranging from 12-24 MW in order to test compressors prior to ultimate delivery to the end user. However, the customer had a major constraint: space. Energyst developed for the customer the most innovative solution...


 
Contact Us

Phone

We are here for you to answer all your questions

We will contact
you within 24 hours

Energyst Depot Locator

We provide coverage worldwide

To see addresses and phones of our representations, simply press on a country at the left.
Search

 

Customer story
Energyst supplies power to its own cooling installation during a shutdown operation

During a planned shutdown at BP Chembel in Geel (Belgium), Energyst cooling systems are used to provide a heat exchanger with the required flow of chilled water for the condensation of the primary gas flow.

Inventory Sales

At Energyst you can buy equipment that no longer meets the requirements for of the most attractive rental market segments.

Click here to read Energyst's high efficiency chiller case study