Locations:
Rental enquiry?Call: 00800 3637 4978 (+800 – ENERGYST)

NEWS OVERVIEW

4/9/2013 - Recertification VCA++ awarded to Energyst Bladel depot

April 8th, 2013, Lloyd's auditor evaluated the Energyst Bladel depot (Benelux) for recertification VCA++. Being the safety certificate required by our customers.

With nothing less than positive feedback towards our Benelux colleagues Lloyds has awarded Energyst (again) with the VCA++ certificate. Next to the auditors positive remarks on safety, the Bladel depot was praised for it's order and cleanliness. All in all a top result; thanks to all colleagues.

1/17/2013 - Escondida Mining Company and Energyst Cat Rental Power sign 3 year deal


Energyst to provide 23 MW emergency power plant for Puerto Coloso, Antofagasta - Chile

BREDA, Netherlands – For the next three years Energyst Cat Rental Power will provide Escondida Mining Company with a 23 Mw / 50 Hz / 13,8 Kv emergency power plant. The mining company, largely owned by BHP Billiton utilizes the world’s largest copper mine and is located in the Atacama Desert in the north of Chile. Energyst will supply all the necessary self-contained power generation modules, transformers, switchgear, cables and fuel tanks on a rental basis including all the necessary operational services.

8/24/2012 - Professional tunnellers demand powerful partners

The construction of a tunnel is an extremely complex and demanding engineering task. It not only requires the right expertise and equipment, but also the right partners are needed. In such a complex process the guaranteed supply of sufficient power is a prerequisite for success. As Energyst Cat Rental Power CEO Gary Smith reveals, ‘With our experience in Spain, UK, Ireland and Germany we know what it takes to deliver’.

7/4/2012 - New 500 kW Chiller sets the tone

Energyst introduces its 500 kW chiller and with this creates a new standard for the rental market. Such as is to be expected from Energyst, much time and care has been paid to the development of the new chiller.

4/3/2012 - Energyst will supply temporary climate control during UEFA Champions League Finale!

The most important final for soccer clubs in Europe will be held on May 19th. The host of this major sports event is the Allianz Arena in Munich, but will be transformed for this important final into the "Fussball Arena Munich".

2/10/2012 - Race against the clock!

Race against the clock   The Netherlands has lived between hope and fear during the last week. Would the ice skating “Race of Races” go on? After several nights of freezing cold, chances would be that the 16th edition of

1/26/2012 - Caterpillar and Energyst sign agreement on international power projects

PEORIA, IL – Caterpillar Inc. and Energyst Cat Rental Power today announced that the companies have signed a five-year agreement to globally develop temporary power solutions. By working with Caterpillar, Energyst will further strengthen its position in the international power projects (IPP) market by offering readily available, competitively priced power solutions from Caterpillar supported by partnerships within the extensive Cat® dealer network.

11/15/2011 - Energyst within the petrochemical industry

Energyst within the petrochemical industry Within the petrochemical industry in Antwerp, Energyst delivered a temporary power solution during maintenance works on a critical electrical substation. The goal to feed important pumps during 4 weeks and therefore secure the production was

11/15/2011 - Now available : New Hot Water Systems 340kW (boiler) – High Efficiency

Following it’s historical success Energyst has invested in new mobile Hot Water Systems (boilers) in the 340kW range.

9/1/2011 - Energyst Argentina signed contract for 2 years with Energia de San Juan

Energyst Argentina signed contract for 2 years with Energia de San Juan. This contract is a 9 MW standby contract for peak shaving from two locations, Tamberias and Valle Fertil.

4/21/2010 - BASF the Chemicial Company chooses Energyst for its biggest production site

BASF the Chemical Company chooses Energyst for its biggest production site. BASF helps its customers to be more successful through intelligent system solutions and high quality products. BASF needs suppliers that understand the need for process control and has developed a sourcing strategy to ensure this in temporary power and temperature control rental. The 2010 sourcing exercise resulted in Energyst winning the status of Strategic Partner for the main BASF productions sites

3/10/2010 - Energyst chiller efficiency case study

Chiller efficiency case study This chiller case study demonstrates that Energyst chillers and application design give energy efficiencies that are much better than theoretical figures often used. You can order a free of charge reprint of the case study by

2/27/2010 - Seven Atlantic, an ultra modern support vessel

Seven Atlantic 2She was ready earlier this year: the Seven Atlantic, an ultra modern support vessel for divers in the North Sea. Responsible for the electrical wiring is Croon-Bakker Sliedrecht, who during the test phase could rely on the services of Energyst CAT ® Rental Power.

2/27/2010 - Providing Africa with a Power shortage solution

AfricaWith limited power generation capabilities, increase in electricity demand due to the expansion of most economy driving sectors throughout Africa, rental power plants seems to be the new kid on the block to curb the current energy shortage, despite the lack of a rental power equipment culture on the continent.

2/27/2010 - Phasing out R22: Energyst works with you!

R22 borden

From 1st January 2010, it will no longer be permitted to use the new refrigerant R22 to (re)fill existing cooling systems. R22 is an HCFC, is harmful to the ozone layer, and the government has ordered it to be phased out. Until 2015 only regenerated R22 may be used. R22 will be completely prohibited from 2015. What will this mean for your equipment and how can you continue using it?

2/27/2010 - Emergency when emergency calls

Medic2

When energy supplies fail it often causes much inconvenience. However, for people who depend on the Emergency Services and medical equipment, the failure of power supplies can be life-threatening. Where emergency power supplies are insufficient, a hospital should be able to rely on a "calamity partner" to provide emergency assistance.

2/27/2010 - CliniClowns theatre tour “the empire of senses”

Clini_logo

This is the 3rd year that the CliniClowns Foundation, in collaboration with the Sinq Group, has organised "Het Zintuigenrijk" [the Empire of the Senses] theatre tour. This year, the total climate control, power supply and all other arrangements were again provided by Energyst. The requirements were that all areas were at the correct temperatures and that enough..

1/12/2010 - The Varg A Project

THE VARG A PROJECT Energyst Oil & Gas Depot Egersund, Norway At the beginning of September 2008 we were approached by two companies regarding the rental of an O&G unit for a small platform in the North Sea called Varg A...

3/4/2009 - Largest ever project sees Energyst CAT Rental Power install temporary power plant for island of Cyprus

Largest ever project sees Energyst CAT Rental Power install temporary power plant for island of Cyprus "To whom it may concern.   This is to certify that 20th of November 2007 letter of acceptance was signed between BWCS A S,

1/19/2009 - Further expansion Energyst Chili

In line with a further expansion of its growth in the International Power Projects business, Energyst B.V. has establised in close cooperation with Finning International  in Chili as stepping stone for South America a new business foothold.

8/5/2008 - Shipping Forecast Looks Good Thanks To Energyst

Shipping Forecast Looks Good Thanks To Energyst

In today’s uncertain worldwide political climate, the role of the Royal Fleet Auxiliary Service (RFA) has never been so critical and is pivotal to the success of our forces across the globe.

8/5/2008 - Pier-End Job Goes Swimmingly For Energyst

Pier-End Job Goes Swimmingly For Energyst

Having endured 128 years of incessant ocean waves, merciless seagulls and generations of day-tripping tourists, Bournemouth Pier has become legendary for its sturdiness.

But even the toughest and oldest of reputations can tumble so when Energyst Rental Solutions were asked to place two huge generators on the shore at the start of the pier they knew stealth should be a very key factor.

8/5/2008 - Power out of a container

Vehicles can be rented, so can tents and even Santa Claus outfits. It's probably less well known that when air-conditioning or power-supply units are required, they too can be hired rather than purchased outright. One of Europe's biggest providers in this area is Energyst B.V., with their head office in Breda, the Netherlands.

PHONE
00800 3637 4978

We are here for you to answer all your questions.

Important role for Energyst during CATS Benelux
In Germany, BB Promotion is the largest producer of musicals and live entertainment acts. A large tour was planned along various towns for the famous musical CATS. The show took place in a specially developed tent. A temporary power supply was required to be installed.